A class is a permitted deviation, and nothing else. It is set by the finish, proved with a straightedge, and stated on the survey report before any base is prepared.

Regularity stated as a class

cl. 01

Surface regularity is stated as a class, and a class states one figure: the deviation permitted under a 2 m straightedge. It says nothing about level, and it says nothing about fall.

Classes, and the finish each one is set for
ClassDeviation permitted under a 2 m straightedgeSet where the finish is
SR13 mmThin sheet, resin, and any covering laid without a bed
SR25 mmTile to a bed, and thicker sheet and plank coverings
SR310 mmBases carrying a further build-up, or a raised floor above

A class is a maximum, not a target. A base brought to SR1 satisfies a specification written to SR2; a base at SR2 does not satisfy one written to SR1, and it is not brought into class by laying a thicker bed.

Level and regularity are recorded apart on the survey sheet. A floor can be flat and out of level, and it can be level and out of class, and the two are prepared for in different ways.

Proving a class with the straightedge

cl. 02

The straightedge is laid on the base, not held against it. It is laid in two directions at every station, and it is moved by half its length between readings so that no gap is stepped over.

Deviation is read with a slip gauge or a graduated wedge under the edge. The figure written down is the largest gap found under that placing, and it is written against the station it was found at.

An abrupt change is recorded separately from a gradual one. A lipped joint and a gentle dish can give the same figure under the edge, and only one of the two reads through a thin sheet.

Curled edges are read along the joint rather than across it. A slab edge that has curled will give its worst figure within 300 mm of the joint, and that is where the straightedge is placed.

Readings are taken again after preparation, and before the finish is ordered. A base is not accepted into class on the strength of the survey reading alone.

The wall behind a covering

cl. 03

Wall coverings are surveyed on the same principle as floors: the substrate is measured first, and the covering is specified against what the measurement shows.

Flatness is proved with a straightedge held vertically and diagonally across the face. Bulges and hollows are recorded to the nearest millimetre, with the height they were found at.

Background is recorded by type. Plaster, plasterboard, render, masonry and tile-on-tile each carry a different preparation, and each carries a different weight limit for the covering laid on it.

Soundness is tested by tapping. A hollow area of plaster or render is cut out and made good prior to any covering, and the made-good area is brought back to the flatness the covering requires.

Setting out starts from a datum line struck at the survey. Tiling is set out from that line, not from a floor or a ceiling, because neither can be assumed level.

Movement joints in the background are carried through the covering. A joint that is bridged will telegraph through the face, and the covering will then fail along the line of it.

Where a base cannot be brought to class

cl. 04

Three routes are open where the measured deviation exceeds the class the finish demands, and the survey report states which of the three is specified.

The base is corrected. Levelling compound is laid to the mean thickness read off the grid, or high points are ground back, and the base is read again afterwards.

The finish is changed. A covering with a higher permitted deviation is specified, and the class on the report is rewritten to match it.

The base is replaced. Where deviation runs through the whole area, or where the base is unsound under it, a new screed is specified and the drying programme begins again from the day it is laid.

The route is decided against the figures on the grid, and it is decided before anything is ordered. A base that is out of class is recorded as out of class, and it is brought in before the finish arrives on site.

Where correspondence about a floor is needed, quote the reference the report was issued against and write to the surveys mailbox.